Bitterroot Intersects 4.2 Metres Grading 75.4 Grams Gold/Tonne

 (13.8 feet grading 2.2 oz gold/ton), DISCOVERS "HW-1" HIGH-GRADE VEIN

Michael Carr, President of Bitterroot Resources Ltd. (BTT, TSX-V) reports that a 4.2 metre-wide vein/breccia interval grading 75.4 grams gold/Tonne (13.8 feet grading 2.2 oz gold/ton) in hole BTT-E57 is a highlight of additional high-grade drill results from the 100 percent-owned Mineral Creek gold project near Port Alberni, BC. Close-spaced definition drilling of the Ember vein has returned high-grade gold intersections (table 1) and discovered at least one new high-grade gold/silver mineralized vein called the HW-1 vein (table 2).

Drilling of the HW-1 vein returned a 0.3 metre-thick interval grading 137.5 grams gold/Tonne (1.0 feet grading 4.0 oz gold/ton) in hole BTT-E53. A second interval possibly from the HW-1 vein also returned high-grade silver mineralization (1,170 grams silver/Tonne over 0.13 metres, or 0.43 feet grading 34.1 oz silver/ton) in hole BTT-E35. The HW-1 vein is the sixth high-grade gold-bearing vein identified to date on the Mineral Creek property, in addition to the Linda, Ember, 900, 1050 and Mineral Creek zones.

Drilling completed in 2009 has defined the Ember vein over a strike length of 150 metres and an elevation range of at least 90 metres. The more silver-rich HW-1 vein has been drilled over a strike length of 50 metres and an elevation range of 45 metres. These en-echelon veins demonstrate good continuity and pronounced nugget effect, which is typical of high-grade gold deposits. On the Mineral Creek property, high gold grades are often accompanied by visible gold grains. The Ember and HW-1 veins are both open along strike and down dip. The Linda, Ember and HW-1 veins appear to be associated with gold mineralization and historical small-scale underground workings in the Mineral Creek fault zone, which suggests there is good potential for the discovery of additional high-grade gold/silver-bearing structures on this part of the Mineral Creek property. Drill crews are currently in the process of completing the final hole (BTT-E68) of the 2009 exploration season and are expected to demobilize within a week.

Bulk Sampling

As a condition of the original property purchase agreement with the vendor, Mineral Creek Ventures Inc. is extracting a 5,000 tonne bulk sample, with the costs and proceeds split 50/50 with Bitterroot. Mining activities on the Linda vein are currently winding up for the winter. A 100-tonne stockpile of mineralized vein material is currently being crushed. This material will be milled and tabled to produce gold concentrates and sulphide-rich concentrates. A second table has been purchased to allow more efficient recovery of gold from sulphide concentrates. A dore bar containing 36 troy ounces of gold and 8.3 troy ounces of silver was poured on November 3, 2009. Milling of crushed mineralized vein material and tabling of concentrates is expected to continue until mid-December.

Table 1

EMBER VEIN

 

 

 

 

 

 

 

DDH #

From (metres)

To (metres)

Interval (metres)

Estimated True Width (metres)

Au grams/Tonne

Ag grams/Tonne

BTT-E35

70.5

71.4

0.9

0.9

8.9

3.3

 

 

 

 

 

 

 

BTT-E38

82.05

82.5

0.45

0.25

11.7

1.2

 

 

 

 

 

 

 

BTT-E39

96.1

96.75

0.65

0.45

101.0

29.3

 

 

 

 

 

 

 

BTT-E42

92.85

94.1

1.25

0.9

8.2

1.9

 

 

 

 

 

 

 

BTT-E43

42.7

44.15

1.45

1.1

3.1

4.1

 

 

 

 

 

 

 

BTT-E44

42.7

45.05

2.35

2

7.7

2.4

Including;

 

 

 

 

 

 

BTT-E44

42.7

43.75

1.05

 

6.1

2.3

BTT-E44

43.75

44.25

0.5

 

9.5

3.5

BTT-E44

44.25

44.75

0.5

 

0.7

0.6

BTT-E44

44.75

45.05

0.3

 

18.2

4.1

 

 

 

 

 

 

 

BTT-E45

43.65

44.35

0.7

0.6

6.4

3.5

 

 

 

 

 

 

 

BTT-E45

46.55

46.7

0.15

0.1

15.8

7.2

 

 

 

 

 

 

 

BTT-E47

90.45

91

0.55

0.4

11.1

1.0

 

 

 

 

 

 

 

BTT-E49

68.8

69.5

0.7

0.65

8.8

2.0

 

 

 

 

 

 

 

BTT-E50

73.35

73.9

0.55

unknown

27.3

22.9

 

 

 

 

 

 

 

BTT-E52

99

99.7

0.7

0.4

7.5

1.0

 

 

 

 

 

 

 

BTT-E53

78.95

83.55

4.6

3.5

6.3

2.2

Including:

BTT-E53

78.95

79.8

0.85

 

2.3

0.9

BTT-E53

79.8

80.65

0.85

 

1.9

0.9

BTT-E53

80.65

81.4

0.75

 

0.1

0.4

BTT-E53

81.4

82.45

1.05

 

0.0

3.2

BTT-E53

82.45

82.85

0.4

 

4.8

1.4

BTT-E53

82.85

83.55

0.7

 

33.2

6.3

 

 

 

 

 

 

 

BTT-E54

79.7

80.3

0.6

0.6

4.2

1.4

 

 

 

 

 

 

 

BTT-E55

91.55

91.8

0.25

0.25

12.6

7.6

 

 

 

 

 

 

 

BTT-E56

94.4

95.3

0.9

0.55

14.7

1.9

 

 

 

 

 

 

 

BTT-E57

75.05

79.45

4.4

4.2

75.4

9.6

Including:

BTT-E57

75.05

75.65

0.6

 

233.0

45.1

BTT-E57

75.65

76.8

1.15

 

0.7

1.1

BTT-E57

76.8

78

1.2

 

3.0

0.2

BTT-E57

78

78.75

0.75

 

0.1

0.3

BTT-E57

78.75

79.15

0.4

 

467.0

33.4

BTT-E57

79.15

79.45

0.3

 

1.3

0.4


Table 2

HW-1 VEIN

 

 

 

 

 

 

 

DDH #

From (metres)

To (metres)

Interval (metres)

Estimated True Width (metres)

Au grams/Tonne

Ag grams/Tonne

BTT-E35

47.7

47.85

0.15

0.13

7.3

1170

 

 

 

 

 

 

Checked 1135

 

 

 

 

 

 

 

BTT-E39

36

38.7

2.7

2.35

1.7

2.3

 

 

 

 

 

 

 

BTT-E45

31

36

5

2.5

1.4

4.5

 

 

 

 

 

 

 

BTT-E49

28.65

30.45

1.8

1.8

3.3

3.7

BTT-E51

29.9

30.1

0.2

0.2

14.4

9.8

 

 

 

 

 

 

 

BTT-E53

28.8

29.35

0.55

0.3

137.5

29.8

 

 

 

 

 

 

 

BTT-E57

27.6

28.4

0.8

0.7

3

1.3

 

 

 

 

 

 

 

BTT-E58

28.15

28.8

0.65

0.6

2.6

3.4

 

 

 

 

 

 

 

BTT-E59

29.5

30.5

1

0.8

4.8

1.9


Mr. Michael Becherer, P.Geo is the Qualified Person responsible for the design and implementation of exploration programs on the Mineral Creek project. The drill core was logged and sampled by G.A. Price, P. Geo. Samples were assayed by ALS Chemex in North Vancouver, BC. Analysis consisted of procedures Au-AA 23 and ME-ICP41. If Au content was greater than 10 ppm, samples were re-assayed by procedure Au-GRA21. All drill hole intervals reported in this news release achieved 100 percent core recovery.

ON BEHALF OF THE BOARD OF DIRECTORS

Michael S. Carr
Director

The TSX Venture Exchange has not reviewed and does not accept responsibility for the adequacy or accuracy of the contents of this news release.

FORWARD LOOKING STATEMENTS: This document contains statements about expected or anticipated future events and/or financial results that are forward-looking in nature and as a result, are subject to certain risks and uncertainties, such as general economic, market and business conditions, regulatory processes and actions, technical issues, new legislation, competitive conditions, the uncertainties resulting from potential delays or changes in plans, the occurrence of unexpected events and the company's ability to execute and implement its future plans. Actual results may differ materially from those projected by management. For such statements, we claim the safe harbour for forward-looking statements within the meaning of the Private Securities Legislation Reform Act of 1995.

Click Here to view the attached News Release Map in PDF Format.

To View this News Release in PDF Format click on the link Below:
http://www.bitterrootresources.com/i/pdf/news2009-124.pdf