March 22, 2018 Hackberry Silver Project -- Drilling Update | |||||
Bitterroot Resources Ltd. (BTT, TSX-V) has commenced the Phase 2 drilling program at the Hackberry silver project in Mohave County, AZ. The drilling program has been modified and will now test four targets. These targets include the Silver King North, Silver King South and CMH targets, which are located between 0.4 and 2.0 kilometres northwest of the Main Hackberry mine site. The fourth target area is located west of the Main Hackberry mine area, where drilling will test the projected mineralized zone approximately 90 metres down-dip of the mineralized intercept in drill hole HB-17-06, which intersected 4.87 metres grading 259 grams Ag/tonne (estimated true thickness 3.56 metres), including 1.65 metres grading 667 grams Ag/tonne (estimated true thickness 1.21 metres). Michael S. Carr Director Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release. FORWARD LOOKING STATEMENTS: This document contains statements about expected or anticipated future events and/or financial results that are forward-looking in nature and as a result, are subject to certain risks and uncertainties, such as general economic, market and business conditions, regulatory processes and actions, technical issues, new legislation, competitive conditions, the uncertainties resulting from potential delays or changes in plans, the occurrence of unexpected events and the company’s ability to execute and implement its future plans. Actual results may differ materially from those projected by management. For such statements, we claim the safe harbour for forward-looking statements within the meaning of the Private Securities Legislation Reform Act of 1995. | |||||
| |||||